Skip to content

Watford City, North Dakota

McKenzie Electric Cooperative

A three-building, 80,000-square-foot campus with ThermaRay thermal mass panels laid on sand before the slabs were poured.

Buildings
Admin building, warehouse and vehicle storage
Size
80,000 sq ft across 3 buildings
ThermaRay thermal mass heating panels laid out on sand before the slab is poured at McKenzie Electric Coop
Panels laid out before the pour.

The project

McKenzie Electric Cooperative’s campus in Watford City has three buildings totaling 80,000 square feet: an administration building, a warehouse and vehicle storage.

ThermaRay thermal mass floor heating panels went in under the slab. Inside the steel frame, the panels were laid in rows on a bed of sand and wired together before the slab was poured.

From the Premier Projects page and install photos on premierenergyusa.com. See the Premier Projects page

Rows of ThermaRay thermal mass panels on sand inside a steel building frame at McKenzie Electric Coop
Rows of panels on sand inside the steel frame.
ThermaRay thermal mass panels on sand with wiring running between them at McKenzie Electric Coop
Wiring runs between the panels.
McKenzie Electric Cooperative administration building, labeled Watford City, ND, 3 buildings, 80,000 square feet
The administration building.

Planning a project like this?

Tell us about the building and we'll size the system room by room, with drawings and install instructions for you or your electrician.